Skip to main content
IMG 20211006 144404 edit kopi

IK-Group's Pipeline Services Department are running dual diameter pig testing.  The department are making a prototype multiphase flowline pig that will run through a 14” subsea pipeline and up a 18” riser, for client.

They have built a test rig at site to test the dual diameter pig through the different features, which includes 5D bends, barred T piece and a transition from 14”-18”, and are now experimenting with different disc configurations to make the pig go through the line as smooth as possible. From the testing, they will deliver a dual diameter dewaxing pig and a dual diameter dewatering pig.

 

kopi  

 

 

Back to all News