Umbilical Re-Routing tool
Re-Routing tool ready for delivery

IK-Norway has successfully designed and tested a tool for umbilical Re-Routing. The design is developed from some new interesting ideas from the IK team and has been well received by the client. The objective was to utilize spare hydraulic lines in existing umbilical. The alternative was to lay a new umbilical. In other words, a big cost saving for the client.

 

Re-Routing tool during testing

Re-Routing tool during testing