Sealing Integrity Clamp for 10” x 6” Tie-in

EPC and installation of integrity clamp to seal off an external leakage on a water-cooling system in a Norwegian process plant.

Product/Service:

Pipe Intervention

Year:

September 2019

Location:

Northern Norway, Processing plant

Project Manager:

Roald Kolnes

During maintenance, the operator discovered a leakage in a 10x 6" piping system, where the leak was in an existing golden weld with nearby pipes and obstructions. IK-Group delivered and installed an integrity clamp. The fast track project was delivered based on IK CBER system and our speciality understanding of repair systems.

  • Emergency response CBER
  • Tie in split clamp
  • Integrity clamp