IK Group is proud to present a state-of-the-art product that pushes the limits of engineering yet meets the requirements set by governing standards and rules.
The Emergency Pipeline Repair System (EPRS) covers 16″, 18″, and 24″ pipeline sizes and guarantees the sealing and structural integrity of these pipelines in case of emergency. It has a 20-year lifetime expectancy and a maximum operating pressure of 431bar.