Skip to main content
March 2021 2 repair clamp

Topside Services Pipe Intervention team have once again shown why IK-Group is a leader in the emergency pipe repair field.  

At the start of April, IK received an urgent call for assistance from an international Oil and Gas Operator who had discovered issues with two of their pipelines in the Norwegian Continental Shelf (NCS).  Operating a 3/4" branch/12" header at a pressure of 170bar and a 3/4" branch/12" header and 200bar, IK designed and fabricated a solution in-house and then installed the two emergency repair clamps. 

If you would like more information regarding IK's Pipe Intervention services, you can visit our information page here or you can contact Roald Kolnes directly here.

March 2021 1 repair clamp

 

Back to all News