- Select Option
- General News
- Projects
-
14. January 2021
IK’s Subsea Department Successfully Deliver Orbital Coating Removal Tool to Africa
-
31. December 2020
Subsea Team Continue to Deliver During Festive Period
-
11. December 2020
IK Improving Visibility For Next Generation
-
8. November 2020
AOGV Webinar Series (Winter 2020) – We’ll Save You Money On Your Next Scheduled Shutdown!
-
9. October 2020
PRESS RELEASE: IK-Norway Successfully Completes One of the World’s Deepest Subsea Repairs
-
30. September 2020
Interview: Your Projects Are in Safe Hands at IK
-
13. July 2020
PRESS RELEASE: Equinor Energy AS Enters Into Framework Agreement With IK-Norway AS for Live System Isolation Services
-
30. June 2020
IK-Group’s AOGV Team Present to Young Pipeline Professionals Europe
-
15. June 2020
Interview: Meet IK’s New Subsea Manager
-
11. June 2020
PRESS RELEASE: Equinor Energy AS and IK-Group AS Enter Into 5-Year Framework Agreement
-
21. April 2020
IKs Operation Critical Task Team Continue to Assist
-
14. April 2020
IK-Norway Deliver New Resato HPU-Testbox system
-
19. March 2020
IK-Group AS COVID-19 Statement
-
7. February 2020
IK-Group Appoints New VP Business Development & Sales
-
30. January 2020
IK Achieve Top Credit Rating
-
1. November 2019
Successful Replacement of Butterfly Valve on Live System
-
23. August 2019
We’re Exhibiting at Offshore Europe
-
6. May 2019
Hydraulic Driven Pig Retrieval Trolley
-
12. April 2019
4in- class 150 AOGV for Isolation without shutdown
-
15. March 2019
Scar Rectification Tool
-
21. January 2019
IK-Norway are attending STMI Forum
-
10. December 2018
6in Patch Repair Clamp
6in Patch Repair Clamp
-
9. November 2018
AOGV one-pager
ISOLATION WITHOUT SHUTDOWN
-
15. October 2018
Protected: Scissor Clamps for permanent leak repair
IK-Norway recently designed, built and supervised the installation of two Scissor Clamps for permanent leak repair of a subsea water injection meter installed in a subsea flowbase structure.
-
15. August 2018
Bend Repair Clamp
IK have successfully supervised the installation of an IK designed subsea pipeline repair clamp. The clamp is designed to reinstate the permanent structural and pressure integrity of an partially buckled pipeline.
-
1. May 2018
AOGV: New Method for Process Isolation featuring at OTC 2018
The AOGV – Add On Gate Valve, is a field proven patented technology which inserts an isolation spade on a live flanged connection thereby increasing up time and eliminating the need for extensive isolation activities.
-
15. November 2017
AOGV: New method for safe process isolation
Positive isolation by splitting a pair of flanges and inserting a blind spade on a live system reduces cost significantly in relation to intrusive maintenance. The AOGV ™ (Add On Gate Valve) inserts an isolation spade on a live flange at the maintenance location and significantly reduces the need for drainage, venting, purging and flushing.
-
8. November 2017
Jacket pile-sleeve connections / Inspection and Repair of grouted connections
During the 2017 season IK have executed several projects related to the sleeve – pile connection for offshore jackets. These projects have been related to repairs, monitoring and grout sampling
-
15. October 2017
IK-Norway & Resato partnership
Together into a successful future. To support the development of the oil & gas industry in Norway with safe and reliable high pressure equipment, Resato International B.V. introduces a new partnership with IK-Norway in Stavanger.
-
14. October 2016
Umbilical Re-Routing tool
In October IK-Norway delivered two sets of umbilical Re-Routing tools to the Norwegian market.
-
9. September 2016
Anode connection clamps
IK has delivered a number of anode connection clamps to a pipeline operator.
-
1. September 2016
Webinar MEGARTs System
Online Electronics Ltd. Part of the IK-Group of companies will be hosting a Webinar for our MEGARTs system.
-
18. August 2016
IK-UK supplies multiple pigs for Foinaven
IK-UK manufactured over 100 pigs for BP exploration to Foinaven in three weeks while running on close to full capacity for other jobs. This shows the flexibility in IK-UK to handle excess capacity needs.
-
15. July 2016
Sealing clamps with additional structural support clamp
For an international company 4 sets of Sealing/structural clamps were successfully installed in December.
-
30. June 2016
Tanap Project
IK delivered a 56” pipeline pigs to the Tanap Project.
-
15. June 2016
Subsea Repair Clamp successfully installed
Subsea repair clamps successfully installed at the Bonga field outside west Africa.
-
1. June 2016
Relocation of Online Electronics
Online Electronics move to Blackburn Business Park Complete
-
15. May 2016
IK-Saudi has started production
IK-Saudi has now commissioned the machines and have started production of Polyurethane. This is an important milestone. We are now ready to serve the Saudi and GCC market with IK products.
-
1. May 2016
IK-Norway is focusing on international opportunities
Two repair clamps delivered successfully offshore West Africa.
-
27. February 2016
They Just Get Bigger
In February 2016 IK-UK manufactured 7 of the largest foam pigs the factory had ever produced measuring over 2 metres in diameter and over 3 metres in length.
-
8. December 2015
Aramco Investment Forum 2015
Appreciation letter received from Aramco Overseas Company B.V. to our CEO, Christian Bull Eriksson, for his participation in the Aramco Investment Forum 2015
-
2. November 2015
IK-Group exhibiting at ADIPEC 2015
We are exhibiting at ADIPEC 2015. Please visit us on the Saudi Aramco Energy Ventures (SAEV) Innovation Zone; Hall 5, Stand 5330.
-
1. November 2015
Thank you for visiting us at OTD 2015!
Another great year at OTD Stavanger! Thank you to everyone who made the show a success.
-
14. October 2015
Offshore Technology Days 2015
IK-Norway is exhibiting at OTD 2015. Please visit us on Stand C3206.
-
9. September 2015
Self supporting 56” pig manufactured by IK-UK
Hot off the production line at IK-UK’s manufacturing facility – a very impressive self-supporting 56” pig, weighing in at 1.9t.
-
15. August 2015
IK-Group is exhibiting at OE 2015
Visit the IK-UK team at Stand 4A121 and the Online Electronics team at Stand 2E36
-
2. July 2015
IK-Group/Online Electronics: Speaker at Aberdeen-Stavanger Gateway 2015
IK-Group / Online Electronics are delighted to be a speaker at the Aberdeen-Stavanger Gateway 2015 taking place on 2 June at the Norwood Hall in Aberdeen.
-
1. March 2015
OUTSTANDING ACHIEVEMENT AWARD RECEIVED FROM SHELL
We are proud to have received an Outstanding Achievement Award from Shell for repair of a high pressure deep water subsea well.
-
3. February 2015
CERTIFICATE OF GREAT ACHIEVEMENT FOR PIPELINE REPAIR
PGN in Indonesia issue a Certificate of Great Achievement
-
1. February 2015
Her ansetter de, selv i nedgangstider
IK-Group på Forus kjøper det skotske selskapet Online Electronics. Det sikrer arbeidsplasser og skaper nye, til tross for fallende oljepris.
-
15. December 2014
GASELLE 2014
IK-Norway ble i 2014 Gaselle-bedrift. Dette er fjerde gang bedriften får en slik pris.
-
12. November 2014
Isolation and weld joint testing of pipeline
Equipment that can satisfactorily seal and isolate pipelines is important during any inspection, maintenance, alteration or repair programme. While the primary function is to test welds, it can also be necessary to carry out hot work and isolation of systems.
-
3. October 2014
A stabilizing influence
When the Varg A monotower offshore Norway required stabilization, IK came up with a novel, remote, subsea solution. Elaine Maslin found out more after hearing about the project at the Underwater Technology Conference in Bergen earlier this year.
-
1. October 2014
IK-Norway at OTD
The OTD2014 BERGEN exhibition attracts an audience of engineers, technical specialists, industry leaders and experts to share ideas and innovations from the Norwegian continental shelf. Meet us on stand 3047 – Hall B.
-
12. September 2014
IK-Group has acquired Online Electronics Limited.
IK-Group AS (IK) is pleased to announce that it has acquired Online Electronics Limited (OEL), a leading global pipeline communications specialist.
-
1. July 2014
Video about Subsea Clamp on Brage
In this project we have designed and delivered Upper Support Clamp, Subsea Clamp, Centralizer and lifting clamps for the installation of a Caisson on Brage.
-
16. June 2014
Bishop of Durham is apprentice for the day
FOR a man who conducts most of his business from the pulpit and the House of Lords, the The Right Revd, Paul Butler, Bishop of Durham proved a dab hand with a plasma cutter after signing up for an NECC apprenticeship.
-
6. June 2014
Fjerning av lastebøyer på Gullfaks feltet
Utfordringer og løsninger knyttet til frigjøringsoperasjonen.
-
17. May 2014
Pig maker is bringing home the bacon
Skip past the aforementioned farm animal, derogatory terms for greedy individuals, law enforcement officers and oblong masses of smelted iron, and you’ll find, “a device which fits snugly inside an oil or gas pipeline and is sent through it to clean or test the inside”.
-
2. May 2014
Timelaps – New workshop
Watch the new workshop rise form the ground in this time-lapse video.
-
15. April 2014
Change of address
Due to IK’s growth and expansion the last couple of years we are now relocating. We are happy to announce that we got a great new facility not far from the old location at Forus / Stavanger.
-
18. March 2014
Press article in The Journal
“Young innovators share best practice” – Press article in The Journal
-
3. March 2014
IK-Saudi is now registered as a Limited Company
IK-Saudi has now obtained all necessary permits to operate in Saudi.
-
15. January 2014
Loading System Removal and Replacement at Gullfaks
Technip is contracted by Statoil to perform topside preparations, subsea works by ROV and Saturation Divers and towing works related to the SPM (Single Point Mooring / Loading Buoy) removal and OLS installation operations for the Gullfaks Future Oil Export (GFO) Project.