Tanap Project

IK delivered a 56” pipeline pigs to the Tanap project.

The Trans-Anatolian Natural Gas Pipeline (TANAP; Turkish: Trans-Anadolu Doğalgaz Boru Hattı) is a natural gas pipeline from Azerbaijan through Georgia and Turkey to Europe. It will be a central part of the Southern Gas Corridor, which will connect the giant Shah Deniz gas field in Azerbaijan to Europe through the South Caucasus Pipeline (SCP), TANAP and the Trans Adriatic Pipeline (TAP).

This order has required a weekly shipment of 10 tonnes per week for 10 weeks, PU to make all the discs.

A significant quantity of 56” pigs with different configurations were designed and produced in 4 weeks. The picture show only the first delivery: 17 pigs of 46 Pigs and a total quantity of 84 wear & tear Kit Spares.