Pipeline Recovery Tool, Pin Through

IK design and deliver subsea recovery tools for a large variety of purposes The Pin Through Recovery Tool is special intended for pipelines or pipes / members where the standard PRT tools cannot be used.

  • Function: The lifting device is equipped with a drilling unit. The pin is inserted by the drilling operation
  • Loads, typical: 10 Te – 500 Te ( Even larger span may be delivered )
  • Pipe dimensions, typical: 6” – 60”. ( Even larger span may be delivered )
  • Operation: Lifted in by surface crane , ROV operated and controlled Integrated or separate drilling machine may be used.

Contact for this product is:


Pål Angell Bergh: Department Manager SubSea - IK Norway
T: +47 51 44 67 18     eMail: