Skip to main content

High Pressure / High Flow Decommissioning Plugs

Product/Service:

High Pressure / High Flow Decommissioning Plugs

Year:

Dec 2020 - Jan 2021

Location:

Mediterranean Sea

Project Manager:

Iana Galanova

IK designed and delivered 5 off high pressure and high flow decommissioning plugs for a subsea decommissioning project.

 The plugs were used for flushing and decommissioning of several 6” flow lines at the field and the field was located at 800 meter of water and all operations were performed by ROV.

The plugs included a class 4 torque bucket for the setting operation and were designed for handling both external and internal pressure, 80 bar and 270 bar.

 The plugs were delivered with 2” receptacle and stabs for the flushing operation. The plugs were delivered with blind / dummy stabs for sealing after the flushing operation

Send a question or enquiry about this project

Please tick the box to prove you're a human and help us stop spam.
Back to all Projects