Johan Sverdrup Pig Recovery Equipment Mongstad

Design, fabricate and test a pig recovery machine

Product/Service:

PPS

Year:

October 2018 / May 2019

Location:

Norway

Project Manager:

Brian McGillivray

Aker Solutions AS awarded IK Norway AS a contract for design, fabrication, testing and qualification of a new Pig Receiver Tray Table system and Pig Storage Rack as part of the Mongstad Terminal modification project for the 36’’ Oil Import pipeline Pig Receiver. The new Pig handling trolley will be used when receiving 36” cleaning and 36” ILI pigs from the Johan Sverdrup field.

  • 20 week lead time.
  • ATEX compliant.
  • Hydraulically driven.
  • Design life: 40 years.
  • Max load: 3.1 T.